Home

Instantiations, Inc.

        VA Assist Enterprise IBM Solution Exellence Award

 

VA Assist HomeProduct DetailsPurchaseDownloadDocumentationLiteratureTechnical SupportInstantiations Home PageSearch Instantiations' Web


IBM Business Partner

Address & Copyright

Change Repository Synchronization

ent_only.jpg (778 bytes) VA Assist Enterprise Only

Two powerful options have been added to the "Change Repository" function in the "Repository Window":

change_repos.gif (9039 bytes)

Export current projects

Turning on this option causes all of the currently loaded projects to be automatically exported to the specified repository before the workspace is connected to that specified repository.  This function has been optimized to quickly skip over any project versions that already exist in the specified repository.

Export shared resources

If a shared resources directory is currently in use and a new shared resource directory is specified in the enhanced "Change Repository" dialog, then the contents of the new shared resource directory are compared with the contents of the current shared resource directory.  These changes are then displayed in a action dialog

change_repos_resources.gif (10606 bytes)

where each change can be applied or ignored as desired.  Clicking the OK button causes the selected (checked) changes to be applied to the new shared resource directory before the workspace is connected to the new repository.


IBM VisualAge Development Products

VisualAge and the VisualAge logo are trademarks of the IBM Corporation.